Denmark vs Djibouti: Dealing with construction permits (DB16-20 methodology) - Score

Denmark
87.88
in 2019
Djibouti
69.4
in 2019
Denmark rank
4th
Djibouti rank
1st

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Denmark
  • Djibouti
020406080201420162019

How they compare

Denmark currently reports 87.88 against 69.4 in Djibouti, a difference of 18.48.

That makes Denmark's figure about 1.3 times Djibouti's.

Across all 6 years both countries report, Denmark has been ahead every year.

Denmark ranks 4th and Djibouti ranks 1st of 188 countries.

Denmark has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Denmark or Djibouti?
Denmark, at 87.88 against 69.4 in Djibouti as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Denmark and Djibouti?
18.48, with Denmark ahead.
How many years of comparable data are there for Denmark and Djibouti?
6 years are reported by both, from 2014 to 2019.
How do Denmark and Djibouti rank globally for dealing with construction permits (db16-20 methodology) - score?
Denmark ranks 4th and Djibouti ranks 1st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.