Gabon vs Puerto Rico: Dealing with construction permits (DB16-20 methodology) - Score

Gabon
59.78
in 2019
Puerto Rico
59.6
in 2019
Gabon rank
140th
Puerto Rico rank
142nd

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Gabon
  • Puerto Rico
0204060201420162019

How they compare

Gabon currently reports 59.78 against 59.6 in Puerto Rico, a difference of 0.18.

The two have swapped places 2 times across 6 shared years of data; in 2014 it was Gabon ahead.

Gabon ranks 140th and Puerto Rico ranks 142nd of 188 countries.

Puerto Rico has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Gabon or Puerto Rico?
Gabon, at 59.78 against 59.6 in Puerto Rico as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Gabon and Puerto Rico?
0.18, with Gabon ahead.
How many years of comparable data are there for Gabon and Puerto Rico?
6 years are reported by both, from 2014 to 2019.
How do Gabon and Puerto Rico rank globally for dealing with construction permits (db16-20 methodology) - score?
Gabon ranks 140th and Puerto Rico ranks 142nd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.