Kyrgyz Republic vs Mexico: Dealing with construction permits (DB16-20 methodology) - Score

Kyrgyz Republic
69.03
in 2019
Mexico
68.85
in 2019
Kyrgyz Republic rank
90th
Mexico rank
93rd

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Kyrgyz Republic
  • Mexico
0204060201420162019

How they compare

Kyrgyz Republic currently reports 69.03 against 68.85 in Mexico, a difference of 0.18.

Across all 6 years both countries report, Kyrgyz Republic has been ahead every year.

Kyrgyz Republic ranks 90th and Mexico ranks 93rd of 190 countries.

Kyrgyz Republic has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Kyrgyz Republic or Mexico?
Kyrgyz Republic, at 69.03 against 68.85 in Mexico as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Kyrgyz Republic and Mexico?
0.18, with Kyrgyz Republic ahead.
How many years of comparable data are there for Kyrgyz Republic and Mexico?
6 years are reported by both, from 2014 to 2019.
How do Kyrgyz Republic and Mexico rank globally for dealing with construction permits (db16-20 methodology) - score?
Kyrgyz Republic ranks 90th and Mexico ranks 93rd of 190 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kyrgyz Republic vs Mexico: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/kyrgyz-republic/mexico/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/kyrgyz-republic/mexico/">Kyrgyz Republic vs Mexico: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.