Malaysia vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score

Malaysia
89.92
in 2019
United Arab Emirates
89.75
in 2019
Malaysia rank
2nd
United Arab Emirates rank
3rd

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Malaysia
  • United Arab Emirates
020406080201420162019

How they compare

Malaysia currently reports 89.92 against 89.75 in United Arab Emirates, a difference of 0.17.

The two have swapped places 3 times across 6 shared years of data; in 2014 it was United Arab Emirates ahead.

Malaysia ranks 2nd and United Arab Emirates ranks 3rd of 190 countries.

United Arab Emirates has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Malaysia or United Arab Emirates?
Malaysia, at 89.92 against 89.75 in United Arab Emirates as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Malaysia and United Arab Emirates?
0.17, with Malaysia ahead.
How many years of comparable data are there for Malaysia and United Arab Emirates?
6 years are reported by both, from 2014 to 2019.
How do Malaysia and United Arab Emirates rank globally for dealing with construction permits (db16-20 methodology) - score?
Malaysia ranks 2nd and United Arab Emirates ranks 3rd of 190 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malaysia vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malaysia/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/malaysia/united-arab-emirates/">Malaysia vs United Arab Emirates: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.