New Zealand vs Taïwan: Dealing with construction permits (DB16-20 methodology) - Score

New Zealand
86.46
in 2019
Taïwan
87.12
in 2019
New Zealand rank
7th
Taïwan rank
6th

Dealing with construction permits (DB16-20 methodology) - Score over time

  • New Zealand
  • Taïwan
020406080201420162019

How they compare

Taïwan currently reports 87.12 against 86.46 in New Zealand, a difference of 0.66.

The two have swapped places 3 times across 6 shared years of data; in 2014 it was New Zealand ahead.

New Zealand ranks 7th and Taïwan ranks 6th of 190 countries.

Taïwan has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, New Zealand or Taïwan?
Taïwan, at 87.12 against 86.46 in New Zealand as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between New Zealand and Taïwan?
0.66, with Taïwan ahead.
How many years of comparable data are there for New Zealand and Taïwan?
6 years are reported by both, from 2014 to 2019.
How do New Zealand and Taïwan rank globally for dealing with construction permits (db16-20 methodology) - score?
New Zealand ranks 7th and Taïwan ranks 6th of 190 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

New Zealand vs Taïwan: Dealing with construction permits (DB16-20 methodology) - Score. Statizoid. Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/new-zealand/taiwan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db16-20-methodology-score/new-zealand/taiwan/">New Zealand vs Taïwan: Dealing with construction permits (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.