South Korea vs Lithuania: Dealing with construction permits: Liability and insurance regimes
Dealing with construction permits: Liability and insurance regimes over time
- South Korea
- Lithuania
How they compare
South Korea currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Lithuania, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Lithuania has been ahead every year.
South Korea ranks 42nd and Lithuania ranks 42nd of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: liability and insurance regimes, South Korea or Lithuania?
- South Korea, at 1 DB16-20 methodology against 1 DB16-20 methodology in Lithuania as of 2019.
- What is the difference in dealing with construction permits: liability and insurance regimes between South Korea and Lithuania?
- 0 DB16-20 methodology, with South Korea ahead.
- How many years of comparable data are there for South Korea and Lithuania?
- 6 years are reported by both, from 2014 to 2019.
- How do South Korea and Lithuania rank globally for dealing with construction permits: liability and insurance regimes?
- South Korea ranks 42nd and Lithuania ranks 42nd of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Liability and insurance regimes index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The liability and insurance regimes index evaluates the stringency of latent defect liability and insurance regimes. It has two components: (i) whether any parties involved in the construction process are held legally liable for latent defects such as structural flaws or problems in the building once it is in use; (ii) whether any party involved in the construction process is legally required to obtain a latent defect liability or decennial (10 years) liability insurance policy to cover possible structural flaws or problems in the building once it is in use. The index is computed based on the methodology in the DB16-20 studies.