Cameroon vs Niger: Dealing with construction permits: Quality control after construction
Cameroon
2 DB16-20 methodology
in 2019
Niger
2 DB16-20 methodology
in 2019
Cameroon rank
132nd
Niger rank
132nd
Dealing with construction permits: Quality control after construction over time
- Cameroon
- Niger
How they compare
Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Niger, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Niger has been ahead every year.
Cameroon ranks 132nd and Niger ranks 132nd of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Cameroon or Niger?
- Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Niger as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Cameroon and Niger?
- 0 DB16-20 methodology, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Niger?
- 6 years are reported by both, from 2014 to 2019.
- How do Cameroon and Niger rank globally for dealing with construction permits: quality control after construction?
- Cameroon ranks 132nd and Niger ranks 132nd of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.