Dealing with construction permits: Quality control after construction in Niger

Niger: Dealing with construction permits: Quality control after construction was 2 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
2 DB16-20 methodology
Change on year
unchanged
World rank
132nd
of 183 countries
All-time high
2 DB16-20 methodology
in 2014
All-time low
2 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control after construction in Niger, 2014–2019

00.511.522014201620192014: 2 DB16-20 methodology2015: 2 DB16-20 methodology2016: 2 DB16-20 methodology2017: 2 DB16-20 methodology2018: 2 DB16-20 methodology2019: 2 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control after construction in Niger is 2 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

Niger ranks 132nd of 183 countries on this measure, in the middle of the range.

Countries ranked near Niger

  1. 129 Nigeria 2.77 DB16-20 methodology compare
  2. 130 Brazil 2.39 DB16-20 methodology compare
  3. 131 Mexico 2.17 DB16-20 methodology compare
  4. 132 Angola 2 DB16-20 methodology compare
  5. 132 Antigua and Barbuda 2 DB16-20 methodology compare
  6. 132 Benin 2 DB16-20 methodology compare
  7. 132 Bolivia 2 DB16-20 methodology compare
  8. 132 Burundi 2 DB16-20 methodology compare
  9. 132 Cambodia 2 DB16-20 methodology compare
  10. 132 Cameroon 2 DB16-20 methodology compare
  11. 132 Central African Republic 2 DB16-20 methodology compare
  12. 132 Comoros 2 DB16-20 methodology compare
  13. 132 Democratic Republic of Congo 2 DB16-20 methodology compare
  14. 132 Congo 2 DB16-20 methodology compare
  15. 132 Cote d'Ivoire 2 DB16-20 methodology compare
  16. 132 Dominica 2 DB16-20 methodology compare
  17. 132 Ethiopia 2 DB16-20 methodology compare
  18. 132 France 2 DB16-20 methodology compare
  19. 132 Gabon 2 DB16-20 methodology compare
  20. 132 Gambia 2 DB16-20 methodology compare
  21. 132 Germany 2 DB16-20 methodology compare
  22. 132 Ghana 2 DB16-20 methodology compare
  23. 132 Grenada 2 DB16-20 methodology compare
  24. 132 Guinea 2 DB16-20 methodology compare
  25. 132 Guinea-Bissau 2 DB16-20 methodology compare
  26. 132 Guyana 2 DB16-20 methodology compare
  27. 132 Haiti 2 DB16-20 methodology compare
  28. 132 Iraq 2 DB16-20 methodology compare
  29. 132 Jamaica 2 DB16-20 methodology compare
  30. 132 Kenya 2 DB16-20 methodology compare
  31. 132 Kiribati 2 DB16-20 methodology compare
  32. 132 Lesotho 2 DB16-20 methodology compare
  33. 132 Madagascar 2 DB16-20 methodology compare
  34. 132 Mali 2 DB16-20 methodology compare
  35. 132 Mauritania 2 DB16-20 methodology compare
  36. 132 Poland 2 DB16-20 methodology compare
  37. 132 Sao Tome and Principe 2 DB16-20 methodology compare
  38. 132 Senegal 2 DB16-20 methodology compare
  39. 132 Solomon Islands 2 DB16-20 methodology compare
  40. 132 South Sudan 2 DB16-20 methodology compare
  41. 132 Saint Vincent and the Grenadines 2 DB16-20 methodology compare
  42. 132 Sudan 2 DB16-20 methodology compare
  43. 132 Suriname 2 DB16-20 methodology compare
  44. 132 East Timor 2 DB16-20 methodology compare
  45. 132 Togo 2 DB16-20 methodology compare
  46. 132 Zambia 2 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Niger

All data for Niger →

Frequently asked questions

What is dealing with construction permits: quality control after construction in Niger?
Dealing with construction permits: quality control after construction in Niger was 2 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control after construction recorded in Niger?
The highest recorded value was 2 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control after construction recorded in Niger?
The lowest recorded value was 2 DB16-20 methodology in 2014.
How does Niger rank for dealing with construction permits: quality control after construction?
Niger ranks 132nd out of 183 countries with data for 2019.
Is dealing with construction permits: quality control after construction rising or falling in Niger?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Niger data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.