Central African Republic vs Poland: Dealing with construction permits: Quality control after construction

Central African Republic
2 DB16-20 methodology
in 2019
Poland
2 DB16-20 methodology
in 2019
Central African Republic rank
135th
Poland rank
135th

Dealing with construction permits: Quality control after construction over time

  • Central African Republic
  • Poland
0123201420162019

How they compare

Central African Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Poland, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Poland has been ahead every year.

Central African Republic ranks 135th and Poland ranks 135th of 186 countries.

Poland has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Central African Republic or Poland?
Central African Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in Poland as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Central African Republic and Poland?
0 DB16-20 methodology, with Central African Republic ahead.
How many years of comparable data are there for Central African Republic and Poland?
6 years are reported by both, from 2014 to 2019.
How do Central African Republic and Poland rank globally for dealing with construction permits: quality control after construction?
Central African Republic ranks 135th and Poland ranks 135th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Central African Republic vs Poland: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/central-african-republic/poland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/central-african-republic/poland/">Central African Republic vs Poland: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.