Congo, Democratic Republic of the vs Dominica: Dealing with construction permits: Quality control after construction
Congo, Democratic Republic of the
2 DB16-20 methodology
in 2019
Dominica
2 DB16-20 methodology
in 2019
Congo, Democratic Republic of the rank
134th
Dominica rank
134th
Dealing with construction permits: Quality control after construction over time
- Congo, Democratic Republic of the
- Dominica
How they compare
Congo, Democratic Republic of the currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Dominica, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Dominica has been ahead every year.
Congo, Democratic Republic of the ranks 134th and Dominica ranks 134th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Congo, Democratic Republic of the or Dominica?
- Congo, Democratic Republic of the, at 2 DB16-20 methodology against 2 DB16-20 methodology in Dominica as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Congo, Democratic Republic of the and Dominica?
- 0 DB16-20 methodology, with Congo, Democratic Republic of the ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Dominica?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo, Democratic Republic of the and Dominica rank globally for dealing with construction permits: quality control after construction?
- Congo, Democratic Republic of the ranks 134th and Dominica ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.