Dealing with construction permits: Quality control after construction in Dominica

Dominica: Dealing with construction permits: Quality control after construction was 2 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
2 DB16-20 methodology
Change on year
unchanged
World rank
134th
of 185 countries
All-time high
2 DB16-20 methodology
in 2014
All-time low
2 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control after construction in Dominica, 2014–2019

00.511.522014201620192014: 2 DB16-20 methodology2015: 2 DB16-20 methodology2016: 2 DB16-20 methodology2017: 2 DB16-20 methodology2018: 2 DB16-20 methodology2019: 2 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control after construction in Dominica is 2 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Dominica 134th out of 185 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Dominica

  1. 131 Nigeria 2.77 DB16-20 methodology compare
  2. 132 Brazil 2.39 DB16-20 methodology compare
  3. 133 Mexico 2.17 DB16-20 methodology compare
  4. 134 Angola 2 DB16-20 methodology compare
  5. 134 Antigua and Barbuda 2 DB16-20 methodology compare
  6. 134 Benin 2 DB16-20 methodology compare
  7. 134 Bolivia 2 DB16-20 methodology compare
  8. 134 Burundi 2 DB16-20 methodology compare
  9. 134 Cambodia 2 DB16-20 methodology compare
  10. 134 Cameroon 2 DB16-20 methodology compare
  11. 134 Central African Republic 2 DB16-20 methodology compare
  12. 134 Comoros, Union of the 2 DB16-20 methodology compare
  13. 134 Congo, Democratic Republic of the 2 DB16-20 methodology compare
  14. 134 Congo, Republic of 2 DB16-20 methodology compare
  15. 134 Côte d'Ivoire 2 DB16-20 methodology compare
  16. 134 Ethiopia, The Federal Democratic Republic of 2 DB16-20 methodology compare
  17. 134 France 2 DB16-20 methodology compare
  18. 134 Gabon 2 DB16-20 methodology compare
  19. 134 Gambia, The 2 DB16-20 methodology compare
  20. 134 Germany 2 DB16-20 methodology compare
  21. 134 Ghana 2 DB16-20 methodology compare
  22. 134 Grenada 2 DB16-20 methodology compare
  23. 134 Guinea 2 DB16-20 methodology compare
  24. 134 Guinea-Bissau 2 DB16-20 methodology compare
  25. 134 Guyana 2 DB16-20 methodology compare
  26. 134 Haiti 2 DB16-20 methodology compare
  27. 134 Iraq 2 DB16-20 methodology compare
  28. 134 Jamaica 2 DB16-20 methodology compare
  29. 134 Kenya 2 DB16-20 methodology compare
  30. 134 Kiribati 2 DB16-20 methodology compare
  31. 134 Lesotho, Kingdom of 2 DB16-20 methodology compare
  32. 134 Madagascar, Republic of 2 DB16-20 methodology compare
  33. 134 Mali 2 DB16-20 methodology compare
  34. 134 Mauritania, Islamic Republic of 2 DB16-20 methodology compare
  35. 134 Niger 2 DB16-20 methodology compare
  36. 134 Poland 2 DB16-20 methodology compare
  37. 134 São Tomé and Príncipe, Democratic Republic of 2 DB16-20 methodology compare
  38. 134 Senegal 2 DB16-20 methodology compare
  39. 134 Solomon Islands 2 DB16-20 methodology compare
  40. 134 South Sudan, Republic of 2 DB16-20 methodology compare
  41. 134 St. Vincent and the Grenadines 2 DB16-20 methodology compare
  42. 134 Sudan 2 DB16-20 methodology compare
  43. 134 Suriname 2 DB16-20 methodology compare
  44. 134 Timor-Leste, Democratic Republic of 2 DB16-20 methodology compare
  45. 134 Togo 2 DB16-20 methodology compare
  46. 134 Zambia 2 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Dominica

All data for Dominica →

Frequently asked questions

What is dealing with construction permits: quality control after construction in Dominica?
Dealing with construction permits: quality control after construction in Dominica was 2 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control after construction recorded in Dominica?
The highest recorded value was 2 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control after construction recorded in Dominica?
The lowest recorded value was 2 DB16-20 methodology in 2014.
How does Dominica rank for dealing with construction permits: quality control after construction?
Dominica ranks 134th out of 185 countries with data for 2019.
Is dealing with construction permits: quality control after construction rising or falling in Dominica?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Dominica data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control after construction in Dominica. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/dominica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/dominica/">Dealing with construction permits: Quality control after construction in Dominica</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.