Democratic Republic of Congo vs Niger: Dealing with construction permits: Quality control after construction

Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Niger
2 DB16-20 methodology
in 2019
Democratic Republic of Congo rank
132nd
Niger rank
132nd

Dealing with construction permits: Quality control after construction over time

  • Democratic Republic of Congo
  • Niger
00.511.52201420162019

How they compare

Democratic Republic of Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Niger, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Niger has been ahead every year.

Democratic Republic of Congo ranks 132nd and Niger ranks 132nd of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Democratic Republic of Congo or Niger?
Democratic Republic of Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Niger as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Democratic Republic of Congo and Niger?
0 DB16-20 methodology, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Democratic Republic of Congo and Niger?
6 years are reported by both, from 2014 to 2019.
How do Democratic Republic of Congo and Niger rank globally for dealing with construction permits: quality control after construction?
Democratic Republic of Congo ranks 132nd and Niger ranks 132nd of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.