Democratic Republic of the Congo vs Poland: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Democratic Republic of the Congo
- Poland
How they compare
Democratic Republic of the Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Poland, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Poland has been ahead every year.
Democratic Republic of the Congo ranks 134th and Poland ranks 134th of 185 countries.
Poland has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Democratic Republic of the Congo or Poland?
- Democratic Republic of the Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Poland as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Democratic Republic of the Congo and Poland?
- 0 DB16-20 methodology, with Democratic Republic of the Congo ahead.
- How many years of comparable data are there for Democratic Republic of the Congo and Poland?
- 6 years are reported by both, from 2014 to 2019.
- How do Democratic Republic of the Congo and Poland rank globally for dealing with construction permits: quality control after construction?
- Democratic Republic of the Congo ranks 134th and Poland ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.