Congo vs Poland: Dealing with construction permits: Quality control after construction

Congo
2 DB16-20 methodology
in 2019
Poland
2 DB16-20 methodology
in 2019
Congo rank
132nd
Poland rank
132nd

Dealing with construction permits: Quality control after construction over time

  • Congo
  • Poland
0123201420162019

How they compare

Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Poland, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Poland has been ahead every year.

Congo ranks 132nd and Poland ranks 132nd of 183 countries.

Poland has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Congo or Poland?
Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Poland as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Congo and Poland?
0 DB16-20 methodology, with Congo ahead.
How many years of comparable data are there for Congo and Poland?
6 years are reported by both, from 2014 to 2019.
How do Congo and Poland rank globally for dealing with construction permits: quality control after construction?
Congo ranks 132nd and Poland ranks 132nd of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.