Dominica vs Togo: Dealing with construction permits: Quality control after construction
Dominica
2 DB16-20 methodology
in 2019
Togo
2 DB16-20 methodology
in 2019
Dominica rank
135th
Togo rank
135th
Dealing with construction permits: Quality control after construction over time
- Dominica
- Togo
How they compare
Dominica currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Togo has been ahead every year.
Dominica ranks 135th and Togo ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Dominica or Togo?
- Dominica, at 2 DB16-20 methodology against 2 DB16-20 methodology in Togo as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Dominica and Togo?
- 0 DB16-20 methodology, with Dominica ahead.
- How many years of comparable data are there for Dominica and Togo?
- 6 years are reported by both, from 2014 to 2019.
- How do Dominica and Togo rank globally for dealing with construction permits: quality control after construction?
- Dominica ranks 135th and Togo ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.