Ethiopia, The Federal Democratic Republic of vs Niger: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Ethiopia, The Federal Democratic Republic of
- Niger
How they compare
Ethiopia, The Federal Democratic Republic of currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Niger, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Niger has been ahead every year.
Ethiopia, The Federal Democratic Republic of ranks 134th and Niger ranks 134th of 185 countries.
Niger has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Ethiopia, The Federal Democratic Republic of or Niger?
- Ethiopia, The Federal Democratic Republic of, at 2 DB16-20 methodology against 2 DB16-20 methodology in Niger as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Ethiopia, The Federal Democratic Republic of and Niger?
- 0 DB16-20 methodology, with Ethiopia, The Federal Democratic Republic of ahead.
- How many years of comparable data are there for Ethiopia, The Federal Democratic Republic of and Niger?
- 6 years are reported by both, from 2014 to 2019.
- How do Ethiopia, The Federal Democratic Republic of and Niger rank globally for dealing with construction permits: quality control after construction?
- Ethiopia, The Federal Democratic Republic of ranks 134th and Niger ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.