Marshall Islands, Republic of the vs Samoa: Dealing with construction permits: Quality control after construction

Marshall Islands, Republic of the
0 DB16-20 methodology
in 2019
Samoa
0 DB16-20 methodology
in 2019
Marshall Islands, Republic of the rank
178th
Samoa rank
178th

Dealing with construction permits: Quality control after construction over time

  • Marshall Islands, Republic of the
  • Samoa
00.20.40.60.81201420162019

How they compare

Marshall Islands, Republic of the currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Samoa has been ahead every year.

Marshall Islands, Republic of the ranks 178th and Samoa ranks 178th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Marshall Islands, Republic of the or Samoa?
Marshall Islands, Republic of the, at 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Marshall Islands, Republic of the and Samoa?
0 DB16-20 methodology, with Marshall Islands, Republic of the ahead.
How many years of comparable data are there for Marshall Islands, Republic of the and Samoa?
6 years are reported by both, from 2014 to 2019.
How do Marshall Islands, Republic of the and Samoa rank globally for dealing with construction permits: quality control after construction?
Marshall Islands, Republic of the ranks 178th and Samoa ranks 178th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Marshall Islands, Republic of the vs Samoa: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/marshall-islands/samoa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/marshall-islands/samoa/">Marshall Islands, Republic of the vs Samoa: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.