Dealing with construction permits: Quality control after construction in Samoa

Samoa: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
0 DB16-20 methodology
World rank
176th
of 183 countries
All-time high
0 DB16-20 methodology
in 2014
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control after construction in Samoa, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 0 DB16-20 methodology2018: 0 DB16-20 methodology2019: 0 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control after construction in Samoa is 0 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

That places Samoa 176th out of 183 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near Samoa

  1. 176 Afghanistan 0 DB16-20 methodology compare
  2. 176 Equatorial Guinea 0 DB16-20 methodology compare
  3. 176 Liberia 0 DB16-20 methodology compare
  4. 176 Maldives 0 DB16-20 methodology compare
  5. 176 Marshall Islands 0 DB16-20 methodology compare
  6. 176 Micronesia, Fed. Sts. 0 DB16-20 methodology compare
  7. 176 Nicaragua 0 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Samoa

All data for Samoa →

Frequently asked questions

What is dealing with construction permits: quality control after construction in Samoa?
Dealing with construction permits: quality control after construction in Samoa was 0 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control after construction recorded in Samoa?
The highest recorded value was 0 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control after construction recorded in Samoa?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does Samoa rank for dealing with construction permits: quality control after construction?
Samoa ranks 176th out of 183 countries with data for 2019.
Where does this Samoa data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.