Sao Tome and Principe vs South Sudan: Dealing with construction permits: Quality control after construction
Sao Tome and Principe
2 DB16-20 methodology
in 2019
South Sudan
2 DB16-20 methodology
in 2019
Sao Tome and Principe rank
135th
South Sudan rank
135th
Dealing with construction permits: Quality control after construction over time
- Sao Tome and Principe
- South Sudan
How they compare
Sao Tome and Principe currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in South Sudan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, South Sudan has been ahead every year.
Sao Tome and Principe ranks 135th and South Sudan ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Sao Tome and Principe or South Sudan?
- Sao Tome and Principe, at 2 DB16-20 methodology against 2 DB16-20 methodology in South Sudan as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Sao Tome and Principe and South Sudan?
- 0 DB16-20 methodology, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Sao Tome and Principe and South Sudan?
- 6 years are reported by both, from 2014 to 2019.
- How do Sao Tome and Principe and South Sudan rank globally for dealing with construction permits: quality control after construction?
- Sao Tome and Principe ranks 135th and South Sudan ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.