Saudi Arabia vs Trinidad and Tobago: Dealing with construction permits: Quality control after construction
Saudi Arabia
3 DB16-20 methodology
in 2019
Trinidad and Tobago
3 DB16-20 methodology
in 2019
Saudi Arabia rank
1st
Trinidad and Tobago rank
1st
Dealing with construction permits: Quality control after construction over time
- Saudi Arabia
- Trinidad and Tobago
How they compare
Saudi Arabia currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Trinidad and Tobago, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Trinidad and Tobago has been ahead every year.
Saudi Arabia ranks 1st and Trinidad and Tobago ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Saudi Arabia or Trinidad and Tobago?
- Saudi Arabia, at 3 DB16-20 methodology against 3 DB16-20 methodology in Trinidad and Tobago as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Saudi Arabia and Trinidad and Tobago?
- 0 DB16-20 methodology, with Saudi Arabia ahead.
- How many years of comparable data are there for Saudi Arabia and Trinidad and Tobago?
- 6 years are reported by both, from 2014 to 2019.
- How do Saudi Arabia and Trinidad and Tobago rank globally for dealing with construction permits: quality control after construction?
- Saudi Arabia ranks 1st and Trinidad and Tobago ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.