Solomon Islands vs Zambia: Dealing with construction permits: Quality control after construction
Solomon Islands
2 DB16-20 methodology
in 2019
Zambia
2 DB16-20 methodology
in 2019
Solomon Islands rank
135th
Zambia rank
135th
Dealing with construction permits: Quality control after construction over time
- Solomon Islands
- Zambia
How they compare
Solomon Islands currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Zambia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Zambia has been ahead every year.
Solomon Islands ranks 135th and Zambia ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Solomon Islands or Zambia?
- Solomon Islands, at 2 DB16-20 methodology against 2 DB16-20 methodology in Zambia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Solomon Islands and Zambia?
- 0 DB16-20 methodology, with Solomon Islands ahead.
- How many years of comparable data are there for Solomon Islands and Zambia?
- 6 years are reported by both, from 2014 to 2019.
- How do Solomon Islands and Zambia rank globally for dealing with construction permits: quality control after construction?
- Solomon Islands ranks 135th and Zambia ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.