Australia vs Peru: Dealing with construction permits: Quality control during construction

Australia
3 DB16-20 methodology
in 2019
Peru
3 DB16-20 methodology
in 2019
Australia rank
1st
Peru rank
1st

Dealing with construction permits: Quality control during construction over time

  • Australia
  • Peru
0123201420162019

How they compare

Australia currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Peru, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Peru has been ahead every year.

Australia ranks 1st and Peru ranks 1st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Australia or Peru?
Australia, at 3 DB16-20 methodology against 3 DB16-20 methodology in Peru as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Australia and Peru?
0 DB16-20 methodology, with Australia ahead.
How many years of comparable data are there for Australia and Peru?
6 years are reported by both, from 2014 to 2019.
How do Australia and Peru rank globally for dealing with construction permits: quality control during construction?
Australia ranks 1st and Peru ranks 1st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Australia vs Peru: Dealing with construction permits: Quality control during construction. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/australia/peru/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/australia/peru/">Australia vs Peru: Dealing with construction permits: Quality control during construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.