Dealing with construction permits: Quality control during construction in Peru
Peru: Dealing with construction permits: Quality control during construction was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Peru, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Peru recorded 3 DB16-20 methodology for dealing with construction permits: quality control during construction in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Peru 1st out of 183 countries with data for 2019, putting it in the top 10%.
Countries ranked near Peru
- 1 China 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for Peru
- Merchandise trade 42.8% (2025)
- Food imports 11.9% (2024)
- Manufactures imports 68.2% (2024)
- Merchandise imports 60.63 billion current US$ (2025)
- Food exports 21.2% (2024)
- Manufactures exports 7.4% (2024)
- Merchandise exports 82.69 billion current US$ (2025)
- Commercial service exports 7.45 billion current US$ (2025)
- Transport services 32.3% (2025)
- Computer, communications and other services 34.7% (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Peru?
- Dealing with construction permits: quality control during construction in Peru was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Peru?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Peru?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Peru rank for dealing with construction permits: quality control during construction?
- Peru ranks 1st out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Peru?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Peru data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.