El Salvador vs Togo: Dealing with construction permits: Quality control during
El Salvador
1 DB16-20 methodology
in 2019
Togo
1 DB16-20 methodology
in 2019
El Salvador rank
139th
Togo rank
139th
Dealing with construction permits: Quality control during over time
- El Salvador
- Togo
How they compare
El Salvador currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.
The two have swapped places 2 times across 6 shared years of data; in 2014 it was Togo ahead.
El Salvador ranks 139th and Togo ranks 139th of 186 countries.
El Salvador has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, El Salvador or Togo?
- El Salvador, at 1 DB16-20 methodology against 1 DB16-20 methodology in Togo as of 2019.
- What is the difference in dealing with construction permits: quality control during between El Salvador and Togo?
- 0 DB16-20 methodology, with El Salvador ahead.
- How many years of comparable data are there for El Salvador and Togo?
- 6 years are reported by both, from 2014 to 2019.
- How do El Salvador and Togo rank globally for dealing with construction permits: quality control during?
- El Salvador ranks 139th and Togo ranks 139th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.