Dealing with construction: Quality control during in El Salvador

El Salvador: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ◆ Volatile

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
139th
of 186 countries
All-time high
1 DB16-20 methodology
in 2017
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in El Salvador, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

El Salvador recorded 1 DB16-20 methodology for dealing with construction permits: quality control during in 2019. That is the highest value across all 6 years on record.

That places El Salvador 139th out of 186 countries with data for 2019, putting it in the middle of the range.

Dealing with construction: Quality control during in El Salvador, year by year

Annual values for Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology) in El Salvador, 2014 to 2019.
Year DB16-20 methodology Change
2014 0 DB16-20 methodology —
2015 0 DB16-20 methodology —
2016 0 DB16-20 methodology —
2017 1 DB16-20 methodology —
2018 1 DB16-20 methodology +0.0%
2019 1 DB16-20 methodology +0.0%

El Salvador compared with similar countries

  • El Salvador's 1 DB16-20 methodology is below the median for upper middle income countries, which is 2 DB16-20 methodology, 50% of the median. (55 countries reporting)
  • El Salvador's 1 DB16-20 methodology is above the median for Latin America & Caribbean, which is 1 DB16-20 methodology, 1.0× the median. (33 countries reporting)

Countries ranked near El Salvador

  1. 139 Antigua and Barbuda 1 DB16-20 methodology compare
  2. 139 Burundi 1 DB16-20 methodology compare
  3. 139 Central African Republic 1 DB16-20 methodology compare
  4. 139 Dominica 1 DB16-20 methodology compare
  5. 139 Grenada 1 DB16-20 methodology compare
  6. 139 Guyana 1 DB16-20 methodology compare
  7. 139 Haiti 1 DB16-20 methodology compare
  8. 139 Honduras 1 DB16-20 methodology compare
  9. 139 Kenya 1 DB16-20 methodology compare
  10. 139 Kiribati 1 DB16-20 methodology compare
  11. 139 Malawi 1 DB16-20 methodology compare
  12. 139 Seychelles 1 DB16-20 methodology compare
  13. 139 Solomon Islands 1 DB16-20 methodology compare
  14. 139 South Sudan 1 DB16-20 methodology compare
  15. 139 Sri Lanka 1 DB16-20 methodology compare
  16. 139 East Timor 1 DB16-20 methodology compare
  17. 139 Togo 1 DB16-20 methodology compare
  18. 139 Trinidad and Tobago 1 DB16-20 methodology compare
  19. 139 Vanuatu 1 DB16-20 methodology compare
  20. 139 Zambia 1 DB16-20 methodology compare

See the full ranking of 186 places →

More private sector data for El Salvador

All data for El Salvador →

Frequently asked questions

What is dealing with construction permits: quality control during in El Salvador?
Dealing with construction permits: quality control during in El Salvador was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in El Salvador?
The highest recorded value was 1 DB16-20 methodology in 2017.
What is the lowest dealing with construction permits: quality control during recorded in El Salvador?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does El Salvador rank for dealing with construction permits: quality control during?
El Salvador ranks 139th out of 186 countries with data for 2019.
Where does this El Salvador data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in El Salvador. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/el-salvador/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/el-salvador/">Dealing with construction permits: Quality control during in El Salvador</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.