Hong Kong, China vs Peru: Dealing with construction permits: Quality control during

Hong Kong, China
3 DB16-20 methodology
in 2019
Peru
3 DB16-20 methodology
in 2019
Hong Kong, China rank
1st
Peru rank
1st

Dealing with construction permits: Quality control during over time

  • Hong Kong, China
  • Peru
0123201420162019

How they compare

Hong Kong, China currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Peru, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Peru has been ahead every year.

Hong Kong, China ranks 1st and Peru ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Hong Kong, China or Peru?
Hong Kong, China, at 3 DB16-20 methodology against 3 DB16-20 methodology in Peru as of 2019.
What is the difference in dealing with construction permits: quality control during between Hong Kong, China and Peru?
0 DB16-20 methodology, with Hong Kong, China ahead.
How many years of comparable data are there for Hong Kong, China and Peru?
6 years are reported by both, from 2014 to 2019.
How do Hong Kong, China and Peru rank globally for dealing with construction permits: quality control during?
Hong Kong, China ranks 1st and Peru ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong, China vs Peru: Dealing with construction permits: Quality control during. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/hong-kong-sar-china/peru/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/hong-kong-sar-china/peru/">Hong Kong, China vs Peru: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.