Kosovo vs Netherlands: Dealing with construction permits: Quality control during
Dealing with construction permits: Quality control during over time
- Kosovo
- Netherlands
How they compare
Netherlands currently reports 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo, a difference of 1 DB16-20 methodology.
That makes Netherlands's figure about 1.5 times Kosovo's.
Across all 6 years both countries report, Netherlands has been ahead every year.
Kosovo ranks 20th and Netherlands ranks 1st of 185 countries.
Netherlands has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Kosovo or Netherlands?
- Netherlands, at 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo as of 2019.
- What is the difference in dealing with construction permits: quality control during between Kosovo and Netherlands?
- 1 DB16-20 methodology, with Netherlands ahead.
- How many years of comparable data are there for Kosovo and Netherlands?
- 6 years are reported by both, from 2014 to 2019.
- How do Kosovo and Netherlands rank globally for dealing with construction permits: quality control during?
- Kosovo ranks 20th and Netherlands ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.