Dealing with construction permits: Quality control during construction in Netherlands
Netherlands: Dealing with construction permits: Quality control during construction was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Netherlands, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during construction in Netherlands is 3 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
Netherlands ranks 1st of 183 countries on this measure, in the top 10%.
Countries ranked near Netherlands
- 1 China 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for Netherlands
- Merchandise trade 139.5% (2025)
- Food imports 13.3% (2024)
- Manufactures imports 64.7% (2024)
- Merchandise imports 870.44 billion current US$ (2025)
- Food exports 16.4% (2024)
- Manufactures exports 62.8% (2024)
- Merchandise exports 989.24 billion current US$ (2025)
- Commercial service exports 306.53 billion current US$ (2024)
- Transport services 18.2% (2024)
- Computer, communications and other services 64.2% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Netherlands?
- Dealing with construction permits: quality control during construction in Netherlands was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Netherlands?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Netherlands?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Netherlands rank for dealing with construction permits: quality control during construction?
- Netherlands ranks 1st out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Netherlands?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Netherlands data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.