Seychelles vs East Timor: Dealing with construction: Quality control during
Seychelles
1 DB16-20 methodology
in 2019
East Timor
1 DB16-20 methodology
in 2019
Seychelles rank
139th
East Timor rank
139th
Dealing with construction: Quality control during over time
- Seychelles
- East Timor
How they compare
Seychelles currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in East Timor, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, East Timor has been ahead every year.
Seychelles ranks 139th and East Timor ranks 139th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Seychelles or East Timor?
- Seychelles, at 1 DB16-20 methodology against 1 DB16-20 methodology in East Timor as of 2019.
- What is the difference in dealing with construction permits: quality control during between Seychelles and East Timor?
- 0 DB16-20 methodology, with Seychelles ahead.
- How many years of comparable data are there for Seychelles and East Timor?
- 6 years are reported by both, from 2014 to 2019.
- How do Seychelles and East Timor rank globally for dealing with construction permits: quality control during?
- Seychelles ranks 139th and East Timor ranks 139th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.