Dealing with construction permits: Quality control during construction in East Timor
East Timor: Dealing with construction permits: Quality control during construction was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in East Timor, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during construction in East Timor is 1 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places East Timor 136th out of 183 countries with data for 2019, putting it in the middle of the range.
Countries ranked near East Timor
- 136 Antigua and Barbuda 1 DB16-20 methodology compare
- 136 Burundi 1 DB16-20 methodology compare
- 136 Central African Republic 1 DB16-20 methodology compare
- 136 Dominica 1 DB16-20 methodology compare
- 136 El Salvador 1 DB16-20 methodology compare
- 136 Grenada 1 DB16-20 methodology compare
- 136 Guyana 1 DB16-20 methodology compare
- 136 Haiti 1 DB16-20 methodology compare
- 136 Honduras 1 DB16-20 methodology compare
- 136 Kenya 1 DB16-20 methodology compare
- 136 Kiribati 1 DB16-20 methodology compare
- 136 Malawi 1 DB16-20 methodology compare
- 136 Seychelles 1 DB16-20 methodology compare
- 136 Solomon Islands 1 DB16-20 methodology compare
- 136 South Sudan 1 DB16-20 methodology compare
- 136 Sri Lanka 1 DB16-20 methodology compare
- 136 Togo 1 DB16-20 methodology compare
- 136 Trinidad and Tobago 1 DB16-20 methodology compare
- 136 Vanuatu 1 DB16-20 methodology compare
- 136 Zambia 1 DB16-20 methodology compare
More private sector data for East Timor
- Merchandise trade 56.9% (2025)
- Food imports 28.1% (2023)
- Manufactures imports 49.6% (2023)
- Merchandise imports 979.00 million current US$ (2025)
- Food exports 10.5% (2023)
- Manufactures exports 21.9% (2023)
- Merchandise exports 103.00 million current US$ (2025)
- Commercial service exports 132.58 million current US$ (2025)
- Transport services 31.3% (2025)
- Computer, communications and other services 11.4% (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in East Timor?
- Dealing with construction permits: quality control during construction in East Timor was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in East Timor?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in East Timor?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does East Timor rank for dealing with construction permits: quality control during construction?
- East Timor ranks 136th out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in East Timor?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this East Timor data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.