South Sudan vs Timor-Leste: Dealing with construction permits: Quality control during

South Sudan
1 DB16-20 methodology
in 2019
Timor-Leste
1 DB16-20 methodology
in 2019
South Sudan rank
139th
Timor-Leste rank
139th

Dealing with construction permits: Quality control during over time

  • South Sudan
  • Timor-Leste
00.20.40.60.81201420162019

How they compare

South Sudan currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Timor-Leste, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Timor-Leste has been ahead every year.

South Sudan ranks 139th and Timor-Leste ranks 139th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, South Sudan or Timor-Leste?
South Sudan, at 1 DB16-20 methodology against 1 DB16-20 methodology in Timor-Leste as of 2019.
What is the difference in dealing with construction permits: quality control during between South Sudan and Timor-Leste?
0 DB16-20 methodology, with South Sudan ahead.
How many years of comparable data are there for South Sudan and Timor-Leste?
6 years are reported by both, from 2014 to 2019.
How do South Sudan and Timor-Leste rank globally for dealing with construction permits: quality control during?
South Sudan ranks 139th and Timor-Leste ranks 139th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

South Sudan vs Timor-Leste: Dealing with construction permits: Quality control during. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/south-sudan/timor-leste/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/south-sudan/timor-leste/">South Sudan vs Timor-Leste: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.