Timor-Leste vs Togo: Dealing with construction permits: Quality control during
Timor-Leste
1 DB16-20 methodology
in 2019
Togo
1 DB16-20 methodology
in 2019
Timor-Leste rank
138th
Togo rank
138th
Dealing with construction permits: Quality control during over time
- Timor-Leste
- Togo
How they compare
Timor-Leste currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Timor-Leste ahead.
Timor-Leste ranks 138th and Togo ranks 138th of 185 countries.
Timor-Leste has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Timor-Leste or Togo?
- Timor-Leste, at 1 DB16-20 methodology against 1 DB16-20 methodology in Togo as of 2019.
- What is the difference in dealing with construction permits: quality control during between Timor-Leste and Togo?
- 0 DB16-20 methodology, with Timor-Leste ahead.
- How many years of comparable data are there for Timor-Leste and Togo?
- 6 years are reported by both, from 2014 to 2019.
- How do Timor-Leste and Togo rank globally for dealing with construction permits: quality control during?
- Timor-Leste ranks 138th and Togo ranks 138th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.