Cape Verde vs Republic of Moldova: Dealing with construction permits: Quality of building regulations
Cape Verde
1 DB16-20 methodology
in 2019
Republic of Moldova
1 DB16-20 methodology
in 2019
Cape Verde rank
144th
Republic of Moldova rank
144th
Dealing with construction permits: Quality of building regulations over time
- Cape Verde
- Republic of Moldova
How they compare
Cape Verde currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Republic of Moldova, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Republic of Moldova has been ahead every year.
Cape Verde ranks 144th and Republic of Moldova ranks 144th of 186 countries.
Republic of Moldova has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Cape Verde or Republic of Moldova?
- Cape Verde, at 1 DB16-20 methodology against 1 DB16-20 methodology in Republic of Moldova as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Cape Verde and Republic of Moldova?
- 0 DB16-20 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Republic of Moldova?
- 6 years are reported by both, from 2014 to 2019.
- How do Cape Verde and Republic of Moldova rank globally for dealing with construction permits: quality of building regulations?
- Cape Verde ranks 144th and Republic of Moldova ranks 144th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.