Lesotho vs Saint Vincent and the Grenadines: Dealing with construction permits: Quality of building regulations
Dealing with construction permits: Quality of building regulations over time
- Lesotho
- Saint Vincent and the Grenadines
How they compare
Lesotho currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Saint Vincent and the Grenadines, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Vincent and the Grenadines has been ahead every year.
Lesotho ranks 144th and Saint Vincent and the Grenadines ranks 144th of 186 countries.
Saint Vincent and the Grenadines has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Lesotho or Saint Vincent and the Grenadines?
- Lesotho, at 1 DB16-20 methodology against 1 DB16-20 methodology in Saint Vincent and the Grenadines as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Lesotho and Saint Vincent and the Grenadines?
- 0 DB16-20 methodology, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Saint Vincent and the Grenadines?
- 6 years are reported by both, from 2014 to 2019.
- How do Lesotho and Saint Vincent and the Grenadines rank globally for dealing with construction permits: quality of building regulations?
- Lesotho ranks 144th and Saint Vincent and the Grenadines ranks 144th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.