Dealing with construction permits: Quality of building regulations in Lesotho

Lesotho: Dealing with construction permits: Quality of building regulations was 1 DB16-20 methodology in 2019. ▲ Rising

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
144th
of 186 countries
All-time high
1 DB16-20 methodology
in 2017
All-time low
0.5 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality of building regulations in Lesotho, 2014–2019

00.20.40.60.812014201620192014: 0.5 DB16-20 methodology2015: 0.5 DB16-20 methodology2016: 0.5 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Lesotho recorded 1 DB16-20 methodology for dealing with construction permits: quality of building regulations in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 100.0% over ten years.

Lesotho ranks 144th of 186 countries on this measure, in the bottom quarter.

Dealing with construction permits: Quality of building regulations in Lesotho, year by year

Annual values for Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology) in Lesotho, 2014 to 2019.
Year DB16-20 methodology Change
2014 0.5 DB16-20 methodology
2015 0.5 DB16-20 methodology +0.0%
2016 0.5 DB16-20 methodology +0.0%
2017 1 DB16-20 methodology +100.0%
2018 1 DB16-20 methodology +0.0%
2019 1 DB16-20 methodology +0.0%

Countries ranked near Lesotho

  1. 144 Afghanistan 1 DB16-20 methodology compare
  2. 144 Angola 1 DB16-20 methodology compare
  3. 144 Bolivia, Plurinational State of 1 DB16-20 methodology compare
  4. 144 Burkina Faso 1 DB16-20 methodology compare
  5. 144 Burundi 1 DB16-20 methodology compare
  6. 144 Cape Verde 1 DB16-20 methodology compare
  7. 144 Cyprus 1 DB16-20 methodology compare
  8. 144 Ecuador 1 DB16-20 methodology compare
  9. 144 Germany 1 DB16-20 methodology compare
  10. 144 Greece 1 DB16-20 methodology compare
  11. 144 Grenada 1 DB16-20 methodology compare
  12. 144 Guyana 1 DB16-20 methodology compare
  13. 144 Haiti 1 DB16-20 methodology compare
  14. 144 Honduras 1 DB16-20 methodology compare
  15. 144 Iraq 1 DB16-20 methodology compare
  16. 144 Mali 1 DB16-20 methodology compare
  17. 144 Marshall Islands 1 DB16-20 methodology compare
  18. 144 Republic of Moldova 1 DB16-20 methodology compare
  19. 144 Montenegro 1 DB16-20 methodology compare
  20. 144 Mozambique 1 DB16-20 methodology compare
  21. 144 Paraguay 1 DB16-20 methodology compare
  22. 144 Poland 1 DB16-20 methodology compare
  23. 144 Samoa 1 DB16-20 methodology compare
  24. 144 Sierra Leone 1 DB16-20 methodology compare
  25. 144 Saint Vincent and the Grenadines 1 DB16-20 methodology compare
  26. 144 Suriname 1 DB16-20 methodology compare
  27. 144 Vanuatu 1 DB16-20 methodology compare

See the full ranking of 186 places →

More private sector data for Lesotho

All data for Lesotho →

Frequently asked questions

What is dealing with construction permits: quality of building regulations in Lesotho?
Dealing with construction permits: quality of building regulations in Lesotho was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality of building regulations recorded in Lesotho?
The highest recorded value was 1 DB16-20 methodology in 2017.
What is the lowest dealing with construction permits: quality of building regulations recorded in Lesotho?
The lowest recorded value was 0.5 DB16-20 methodology in 2014.
How does Lesotho rank for dealing with construction permits: quality of building regulations?
Lesotho ranks 144th out of 186 countries with data for 2019.
Is dealing with construction permits: quality of building regulations rising or falling in Lesotho?
Over the last ten years it is up 100.0%. The long-run trend across the full record is rising.
Where does this Lesotho data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality of building regulations in Lesotho. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-of-building-regulations-index-0-2-db16-20/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-of-building-regulations-index-0-2-db16-20/lesotho/">Dealing with construction permits: Quality of building regulations in Lesotho</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.