Afghanistan vs Indonesia: Dealing with construction permits: Time

Afghanistan
199 days
in 2019
Indonesia
200.13 days
in 2019
Afghanistan rank
37th
Indonesia rank
35th

Dealing with construction permits: Time over time

  • Afghanistan
  • Indonesia
0100200300400200520122019

How they compare

Indonesia currently reports 200.13 days against 199 days in Afghanistan, a difference of 1.13 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Afghanistan ahead.

Afghanistan ranks 37th and Indonesia ranks 35th of 185 countries.

Afghanistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Afghanistan Indonesia Difference Ahead
2000s 358 days 191 days 167 days Afghanistan
2010s 262.2 days 197.45 days 64.75 days Afghanistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Afghanistan or Indonesia?
Indonesia, at 200.13 days against 199 days in Afghanistan as of 2019.
What is the difference in dealing with construction permits: time between Afghanistan and Indonesia?
1.13 days, with Indonesia ahead.
How many years of comparable data are there for Afghanistan and Indonesia?
15 years are reported by both, from 2005 to 2019.
How do Afghanistan and Indonesia rank globally for dealing with construction permits: time?
Afghanistan ranks 37th and Indonesia ranks 35th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.