Dealing with construction permits: Time in Afghanistan

Afghanistan: Dealing with construction permits: Time was 199 days in 2019. ▼ Falling

Latest (2019)
199 days
Change on year
unchanged
World rank
37th
of 185 countries
All-time high
358 days
in 2005
All-time low
199 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Afghanistan, 2005–2019

01002003004002005201220192005: 358 days2006: 358 days2007: 358 days2008: 358 days2009: 358 days2010: 358 days2011: 358 days2012: 358 days2013: 354 days2014: 199 days2015: 199 days2016: 199 days2017: 199 days2018: 199 days2019: 199 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Afghanistan is 199 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 44.4% over ten years.

Over the whole period, dealing with construction permits: time in Afghanistan peaked at 358 days in 2005 and was at its lowest, 199 days, in 2014.

That places Afghanistan 37th out of 185 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 358 days 358 days 358 days 5
2010s 262.2 days 199 days 358 days 10

Countries ranked near Afghanistan

  1. 34 Dominican Republic 206 days compare
  2. 35 Indonesia 200.13 days compare
  3. 36 Israel 200 days compare
  4. 38 Chile 195 days compare
  5. 39 Madagascar 194 days compare
  6. 40 Hungary 192.5 days compare

See the full ranking of 187 places →

More private sector data for Afghanistan

All data for Afghanistan →

Frequently asked questions

What is dealing with construction permits: time in Afghanistan?
Dealing with construction permits: time in Afghanistan was 199 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Afghanistan?
The highest recorded value was 358 days in 2005.
What is the lowest dealing with construction permits: time recorded in Afghanistan?
The lowest recorded value was 199 days in 2014.
How does Afghanistan rank for dealing with construction permits: time?
Afghanistan ranks 37th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Afghanistan?
Over the last ten years it is down 44.4%. The long-run trend across the full record is falling.
Where does this Afghanistan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.