Bahrain vs Lithuania: Dealing with construction permits: Time

Bahrain
71 days
in 2019
Lithuania
74 days
in 2019
Bahrain rank
171st
Lithuania rank
169th

Dealing with construction permits: Time over time

  • Bahrain
  • Lithuania
050100150200520122019

How they compare

Lithuania currently reports 74 days against 71 days in Bahrain, a difference of 3 days.

The two have swapped places 1 time across 13 shared years of data; in 2007 it was Bahrain ahead.

Bahrain ranks 171st and Lithuania ranks 169th of 185 countries.

Bahrain has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bahrain Lithuania Difference Ahead
2000s 168 days 160.83 days 7.17 days Bahrain
2010s 163.7 days 108.2 days 55.5 days Bahrain

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bahrain or Lithuania?
Lithuania, at 74 days against 71 days in Bahrain as of 2019.
What is the difference in dealing with construction permits: time between Bahrain and Lithuania?
3 days, with Lithuania ahead.
How many years of comparable data are there for Bahrain and Lithuania?
13 years are reported by both, from 2007 to 2019.
How do Bahrain and Lithuania rank globally for dealing with construction permits: time?
Bahrain ranks 171st and Lithuania ranks 169th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.