Dealing with construction permits: Time (days) (Time days) in Lithuania

Lithuania: Dealing with construction permits: Time was 74 days in 2019. ▼ Falling

Latest (2019)
74 days
Change on year
unchanged
World rank
172nd
of 188 countries
All-time high
161.5 days
in 2005
All-time low
74 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Lithuania, 2005–2019

0501001502005201220192005: 161.5 days2006: 161.5 days2007: 161.5 days2008: 160.5 days2009: 160.5 days2010: 160.5 days2011: 138.5 days2012: 124 days2013: 124 days2014: 104 days2015: 104 days2016: 104 days2017: 75 days2018: 74 days2019: 74 days

Source: World Bank. Measured in days.

Analysis

Lithuania recorded 74 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 53.9% over ten years.

Over the whole period, dealing with construction permits: time in Lithuania peaked at 161.5 days in 2005 and was at its lowest, 74 days, in 2018.

Lithuania ranks 172nd of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Lithuania, year by year

Annual values for Dealing with construction permits: Time (days) in Lithuania, 2005 to 2019.
Year days Change
2005 161.5 days —
2006 161.5 days +0.0%
2007 161.5 days +0.0%
2008 160.5 days -0.6%
2009 160.5 days +0.0%
2010 160.5 days +0.0%
2011 138.5 days -13.7%
2012 124 days -10.5%
2013 124 days +0.0%
2014 104 days -16.1%
2015 104 days +0.0%
2016 104 days +0.0%
2017 75 days -27.9%
2018 74 days -1.3%
2019 74 days +0.0%

Lithuania compared with similar countries

  • Lithuania's 74 days is below the median for high income countries, which is 144.75 days, 51% of the median. (62 countries reporting)
  • Lithuania's 74 days is below the median for Europe & Central Asia, which is 156 days, 47% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 161.1 days 160.5 days 161.5 days 5
2010s 108.2 days 74 days 160.5 days 10

Countries ranked near Lithuania

  1. 169 Taiwan 82 days compare
  2. 170 United States 80.6 days compare
  3. 171 Tonga 77 days compare
  4. 173 Ukraine 72.5 days compare
  5. 174 Bahrain 71 days compare
  6. 175 Burundi 70 days compare

See the full ranking of 188 places →

More private sector data for Lithuania

All data for Lithuania →

Frequently asked questions

What is dealing with construction permits: time in Lithuania?
Dealing with construction permits: time in Lithuania was 74 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Lithuania?
The highest recorded value was 161.5 days in 2005.
What is the lowest dealing with construction permits: time recorded in Lithuania?
The lowest recorded value was 74 days in 2018.
How does Lithuania rank for dealing with construction permits: time?
Lithuania ranks 172nd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Lithuania?
Over the last ten years it is down 53.9%. The long-run trend across the full record is falling.
Where does this Lithuania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Lithuania. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/lithuania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/lithuania/">Dealing with construction permits: Time in Lithuania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.