Dealing with construction permits: Time in Lithuania
Lithuania: Dealing with construction permits: Time was 74 days in 2019. ▼ Falling
Dealing with construction permits: Time in Lithuania, 2005–2019
Source: World Bank. Measured in days.
Analysis
Lithuania recorded 74 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 53.9% over ten years.
Over the whole period, dealing with construction permits: time in Lithuania peaked at 161.5 days in 2005 and was at its lowest, 74 days, in 2018.
Lithuania ranks 169th of 185 countries on this measure, in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 161.1 days | 160.5 days | 161.5 days | 5 |
| 2010s | 108.2 days | 74 days | 160.5 days | 10 |
Countries ranked near Lithuania
More private sector data for Lithuania
- Merchandise trade 95.2% (2025)
- Food imports 13.1% (2025)
- Manufactures imports 63.0% (2025)
- Merchandise imports 49.01 billion current US$ (2025)
- Food exports 19.7% (2025)
- Manufactures exports 60.0% (2025)
- Merchandise exports 41.63 billion current US$ (2025)
- Commercial service exports 28.75 billion current US$ (2025)
- Transport services 45.5% (2025)
- Computer, communications and other services 38.0% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Lithuania?
- Dealing with construction permits: time in Lithuania was 74 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Lithuania?
- The highest recorded value was 161.5 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Lithuania?
- The lowest recorded value was 74 days in 2018.
- How does Lithuania rank for dealing with construction permits: time?
- Lithuania ranks 169th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Lithuania?
- Over the last ten years it is down 53.9%. The long-run trend across the full record is falling.
- Where does this Lithuania data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.