Belgium vs France: Dealing with construction permits: Time (days) (Time days)

Belgium
212 days
in 2019
France
213 days
in 2019
Belgium rank
33rd
France rank
32nd

Dealing with construction permits: Time (days) (Time days) over time

  • Belgium
  • France
050100150200200520122019

How they compare

France currently reports 213 days against 212 days in Belgium, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Belgium ahead.

Belgium ranks 33rd and France ranks 32nd of 188 countries.

Belgium has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belgium France Difference Ahead
2000s 212 days 189.4 days 22.6 days Belgium
2010s 212 days 189 days 23 days Belgium

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belgium or France?
France, at 213 days against 212 days in Belgium as of 2019.
What is the difference in dealing with construction permits: time between Belgium and France?
1 days, with France ahead.
How many years of comparable data are there for Belgium and France?
15 years are reported by both, from 2005 to 2019.
How do Belgium and France rank globally for dealing with construction permits: time?
Belgium ranks 33rd and France ranks 32nd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belgium vs France: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belgium/france/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belgium/france/">Belgium vs France: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.