Dealing with construction permits: Time in Belgium

Belgium: Dealing with construction permits: Time was 212 days in 2019. ▬ Flat

Latest (2019)
212 days
Change on year
unchanged
World rank
31st
of 185 countries
All-time high
212 days
in 2005
All-time low
212 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Belgium, 2005–2019

0501001502002005201220192005: 212 days2006: 212 days2007: 212 days2008: 212 days2009: 212 days2010: 212 days2011: 212 days2012: 212 days2013: 212 days2014: 212 days2015: 212 days2016: 212 days2017: 212 days2018: 212 days2019: 212 days

Source: World Bank. Measured in days.

Analysis

Belgium recorded 212 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Belgium peaked at 212 days in 2005 and was at its lowest, 212 days, in 2005.

That places Belgium 31st out of 185 countries with data for 2019, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 212 days 212 days 212 days 5
2010s 212 days 212 days 212 days 10

Countries ranked near Belgium

  1. 28 Central African Republic 219 days compare
  2. 29 Papua New Guinea 217 days compare
  3. 30 France 213 days compare
  4. 32 Guyana 208 days compare
  5. 33 East Timor 207 days compare
  6. 34 Dominican Republic 206 days compare

See the full ranking of 187 places →

More private sector data for Belgium

All data for Belgium →

Frequently asked questions

What is dealing with construction permits: time in Belgium?
Dealing with construction permits: time in Belgium was 212 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Belgium?
The highest recorded value was 212 days in 2005.
What is the lowest dealing with construction permits: time recorded in Belgium?
The lowest recorded value was 212 days in 2005.
How does Belgium rank for dealing with construction permits: time?
Belgium ranks 31st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Belgium?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Belgium data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.