Dealing with construction permits: Time in Belgium
Belgium: Dealing with construction permits: Time was 212 days in 2019. ▬ Flat
Dealing with construction permits: Time in Belgium, 2005–2019
Source: World Bank. Measured in days.
Analysis
Belgium recorded 212 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Belgium peaked at 212 days in 2005 and was at its lowest, 212 days, in 2005.
That places Belgium 31st out of 185 countries with data for 2019, putting it in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 212 days | 212 days | 212 days | 5 |
| 2010s | 212 days | 212 days | 212 days | 10 |
Countries ranked near Belgium
- 28 Central African Republic 219 days compare
- 29 Papua New Guinea 217 days compare
- 30 France 213 days compare
- 32 Guyana 208 days compare
- 33 East Timor 207 days compare
- 34 Dominican Republic 206 days compare
More private sector data for Belgium
- Merchandise trade 152.4% (2025)
- Food imports 11.8% (2024)
- Manufactures imports 66.2% (2024)
- Merchandise imports 537.70 billion current US$ (2025)
- Food exports 13.3% (2024)
- Manufactures exports 69.1% (2024)
- Merchandise exports 568.11 billion current US$ (2025)
- Commercial service exports 156.88 billion current US$ (2025)
- Transport services 17.2% (2025)
- Computer, communications and other services 56.9% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Belgium?
- Dealing with construction permits: time in Belgium was 212 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Belgium?
- The highest recorded value was 212 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Belgium?
- The lowest recorded value was 212 days in 2005.
- How does Belgium rank for dealing with construction permits: time?
- Belgium ranks 31st out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Belgium?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Belgium data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.