Bolivia vs Czechia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Bolivia
- Czechia
How they compare
Czechia currently reports 246 days against 235 days in Bolivia, a difference of 11 days.
Across all 15 years both countries report, Czechia has been ahead every year.
Bolivia ranks 22nd and Czechia ranks 20th of 185 countries.
Czechia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bolivia | Czechia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 210.8 days | 270 days | 59.2 days | Czechia |
| 2010s | 234.1 days | 246 days | 11.9 days | Czechia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Bolivia or Czechia?
- Czechia, at 246 days against 235 days in Bolivia as of 2019.
- What is the difference in dealing with construction permits: time between Bolivia and Czechia?
- 11 days, with Czechia ahead.
- How many years of comparable data are there for Bolivia and Czechia?
- 15 years are reported by both, from 2005 to 2019.
- How do Bolivia and Czechia rank globally for dealing with construction permits: time?
- Bolivia ranks 22nd and Czechia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.