Dealing with construction permits: Time (days) (Time days) in Czechia

Czechia: Dealing with construction permits: Time was 246 days in 2019. ▼ Falling

Latest (2019)
246 days
Change on year
unchanged
World rank
20th
of 188 countries
All-time high
276 days
in 2005
All-time low
246 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Czechia, 2005–2019

01002003002005201220192005: 276 days2006: 276 days2007: 276 days2008: 276 days2009: 246 days2010: 246 days2011: 246 days2012: 246 days2013: 246 days2014: 246 days2015: 246 days2016: 246 days2017: 246 days2018: 246 days2019: 246 days

Source: World Bank. Measured in days.

Analysis

Czechia recorded 246 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Czechia peaked at 276 days in 2005 and was at its lowest, 246 days, in 2009.

That places Czechia 20th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Czechia, year by year

Annual values for Dealing with construction permits: Time (days) in Czechia, 2005 to 2019.
Year days Change
2005 276 days —
2006 276 days +0.0%
2007 276 days +0.0%
2008 276 days +0.0%
2009 246 days -10.9%
2010 246 days +0.0%
2011 246 days +0.0%
2012 246 days +0.0%
2013 246 days +0.0%
2014 246 days +0.0%
2015 246 days +0.0%
2016 246 days +0.0%
2017 246 days +0.0%
2018 246 days +0.0%
2019 246 days +0.0%

Czechia compared with similar countries

  • Czechia's 246 days is above the median for high income countries, which is 144.75 days, 1.7× the median. (62 countries reporting)
  • Czechia's 246 days is above the median for Europe & Central Asia, which is 156 days, 1.6× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 270 days 246 days 276 days 5
2010s 246 days 246 days 246 days 10

Countries ranked near Czechia

  1. 17 Trinidad and Tobago 254 days compare
  2. 18 Canada 249 days compare
  3. 19 Slovenia 247.5 days compare
  4. 20 Uzbekistan 246 days compare
  5. 22 Kosovo 237 days compare
  6. 22 Kosovo (UNSCR 1244) 237 days compare

See the full ranking of 188 places →

More private sector data for Czechia

All data for Czechia →

Frequently asked questions

What is dealing with construction permits: time in Czechia?
Dealing with construction permits: time in Czechia was 246 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Czechia?
The highest recorded value was 276 days in 2005.
What is the lowest dealing with construction permits: time recorded in Czechia?
The lowest recorded value was 246 days in 2009.
How does Czechia rank for dealing with construction permits: time?
Czechia ranks 20th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Czechia?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Czechia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Czechia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/czechia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/czechia/">Dealing with construction permits: Time in Czechia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.