Dealing with construction permits: Time in Czechia
Czechia: Dealing with construction permits: Time was 246 days in 2019. ▼ Falling
Dealing with construction permits: Time in Czechia, 2005–2019
Source: World Bank. Measured in days.
Analysis
Czechia recorded 246 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Czechia peaked at 276 days in 2005 and was at its lowest, 246 days, in 2009.
That places Czechia 20th out of 185 countries with data for 2019, putting it in the top quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 270 days | 246 days | 276 days | 5 |
| 2010s | 246 days | 246 days | 246 days | 10 |
Countries ranked near Czechia
More private sector data for Czechia
- Merchandise trade 137.3% (2025)
- Food imports 6.7% (2024)
- Manufactures imports 83.7% (2024)
- Merchandise imports 253.34 billion current US$ (2025)
- Food exports 5.4% (2024)
- Manufactures exports 90.2% (2024)
- Merchandise exports 283.62 billion current US$ (2025)
- Commercial service exports 47.51 billion current US$ (2025)
- Transport services 21.3% (2025)
- Computer, communications and other services 49.2% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Czechia?
- Dealing with construction permits: time in Czechia was 246 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Czechia?
- The highest recorded value was 276 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Czechia?
- The lowest recorded value was 246 days in 2009.
- How does Czechia rank for dealing with construction permits: time?
- Czechia ranks 20th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Czechia?
- Over the last ten years it is unchanged. The long-run trend across the full record is falling.
- Where does this Czechia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.