Bolivia vs Slovenia: Dealing with construction permits: Time

Bolivia
235 days
in 2019
Slovenia
247.5 days
in 2019
Bolivia rank
22nd
Slovenia rank
19th

Dealing with construction permits: Time over time

  • Bolivia
  • Slovenia
0100200300200520122019

How they compare

Slovenia currently reports 247.5 days against 235 days in Bolivia, a difference of 12.5 days.

That makes Slovenia's figure about 1.1 times Bolivia's.

Across all 15 years both countries report, Slovenia has been ahead every year.

Bolivia ranks 22nd and Slovenia ranks 19th of 185 countries.

Slovenia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bolivia Slovenia Difference Ahead
2000s 210.8 days 292.8 days 82 days Slovenia
2010s 234.1 days 256.5 days 22.4 days Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bolivia or Slovenia?
Slovenia, at 247.5 days against 235 days in Bolivia as of 2019.
What is the difference in dealing with construction permits: time between Bolivia and Slovenia?
12.5 days, with Slovenia ahead.
How many years of comparable data are there for Bolivia and Slovenia?
15 years are reported by both, from 2005 to 2019.
How do Bolivia and Slovenia rank globally for dealing with construction permits: time?
Bolivia ranks 22nd and Slovenia ranks 19th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.