Dealing with construction permits: Time (days) (Time days) in Slovenia
Slovenia: Dealing with construction permits: Time was 247.5 days in 2019. ▼ Falling
Dealing with construction permits: Time in Slovenia, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Slovenia stood at 247.5 days. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 15.2% over ten years.
Over the whole period, dealing with construction permits: time in Slovenia peaked at 293 days in 2005 and was at its lowest, 247.5 days, in 2013.
That places Slovenia 19th out of 188 countries with data for 2019, putting it in the top 10%.
The long-run direction has been consistently falling across the 15 years of available data.
Dealing with construction permits: Time in Slovenia, year by year
| Year | days | Change |
|---|---|---|
| 2005 | 293 days | — |
| 2006 | 293 days | +0.0% |
| 2007 | 293 days | +0.0% |
| 2008 | 293 days | +0.0% |
| 2009 | 292 days | -0.3% |
| 2010 | 277.5 days | -5.0% |
| 2011 | 277.5 days | +0.0% |
| 2012 | 277.5 days | +0.0% |
| 2013 | 247.5 days | -10.8% |
| 2014 | 247.5 days | +0.0% |
| 2015 | 247.5 days | +0.0% |
| 2016 | 247.5 days | +0.0% |
| 2017 | 247.5 days | +0.0% |
| 2018 | 247.5 days | +0.0% |
| 2019 | 247.5 days | +0.0% |
Slovenia compared with similar countries
- Slovenia's 247.5 days is above the median for high income countries, which is 144.75 days, 1.7× the median. (62 countries reporting)
- Slovenia's 247.5 days is above the median for Europe & Central Asia, which is 156 days, 1.6× the median. (49 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 292.8 days | 292 days | 293 days | 5 |
| 2010s | 256.5 days | 247.5 days | 277.5 days | 10 |
Countries ranked near Slovenia
- 16 Sudan 255 days compare
- 17 Trinidad and Tobago 254 days compare
- 18 Canada 249 days compare
- 20 Czechia 246 days compare
- 20 Uzbekistan 246 days compare
- 22 Kosovo 237 days compare
- 22 Kosovo (UNSCR 1244) 237 days compare
More private sector data for Slovenia
- Merchandise trade 237.4% (2025)
- Food imports 5.3% (2024)
- Manufactures imports 83.0% (2024)
- Merchandise imports 92.53 billion current US$ (2025)
- Food exports 3.7% (2024)
- Manufactures exports 87.4% (2024)
- Merchandise exports 96.60 billion current US$ (2025)
- Merchandise exports (current US$), per capita 45,329 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 1.21 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 22.42 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: time in Slovenia?
- Dealing with construction permits: time in Slovenia was 247.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Slovenia?
- The highest recorded value was 293 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Slovenia?
- The lowest recorded value was 247.5 days in 2013.
- How does Slovenia rank for dealing with construction permits: time?
- Slovenia ranks 19th out of 188 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Slovenia?
- Over the last ten years it is down 15.2%. The long-run trend across the full record is falling.
- Where does this Slovenia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.