Dealing with construction permits: Time in Slovenia

Slovenia: Dealing with construction permits: Time was 247.5 days in 2019. ▼ Falling

Latest (2019)
247.5 days
Change on year
unchanged
World rank
19th
of 185 countries
All-time high
293 days
in 2005
All-time low
247.5 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Slovenia, 2005–2019

01002003002005201220192005: 293 days2006: 293 days2007: 293 days2008: 293 days2009: 292 days2010: 277.5 days2011: 277.5 days2012: 277.5 days2013: 247.5 days2014: 247.5 days2015: 247.5 days2016: 247.5 days2017: 247.5 days2018: 247.5 days2019: 247.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Slovenia stood at 247.5 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 15.2% over ten years.

Over the whole period, dealing with construction permits: time in Slovenia peaked at 293 days in 2005 and was at its lowest, 247.5 days, in 2013.

That places Slovenia 19th out of 185 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 292.8 days 292 days 293 days 5
2010s 256.5 days 247.5 days 277.5 days 10

Countries ranked near Slovenia

  1. 16 Sudan 255 days compare
  2. 17 Trinidad and Tobago 254 days compare
  3. 18 Canada 249 days compare
  4. 20 Czechia 246 days compare
  5. 20 Uzbekistan 246 days compare
  6. 22 Bolivia 235 days compare

See the full ranking of 187 places →

More private sector data for Slovenia

All data for Slovenia →

Frequently asked questions

What is dealing with construction permits: time in Slovenia?
Dealing with construction permits: time in Slovenia was 247.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Slovenia?
The highest recorded value was 293 days in 2005.
What is the lowest dealing with construction permits: time recorded in Slovenia?
The lowest recorded value was 247.5 days in 2013.
How does Slovenia rank for dealing with construction permits: time?
Slovenia ranks 19th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Slovenia?
Over the last ten years it is down 15.2%. The long-run trend across the full record is falling.
Where does this Slovenia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.