Burkina Faso vs Mali: Dealing with construction permits: Time

Burkina Faso
121 days
in 2019
Mali
124 days
in 2019
Burkina Faso rank
111th
Mali rank
108th

Dealing with construction permits: Time over time

  • Burkina Faso
  • Mali
0100200300200520122019

How they compare

Mali currently reports 124 days against 121 days in Burkina Faso, a difference of 3 days.

Across all 15 years both countries report, Mali has been ahead every year.

Burkina Faso ranks 111th and Mali ranks 108th of 185 countries.

Mali has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Burkina Faso Mali Difference Ahead
2000s 188 days 220.2 days 32.2 days Mali
2010s 121 days 140 days 19 days Mali

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Burkina Faso or Mali?
Mali, at 124 days against 121 days in Burkina Faso as of 2019.
What is the difference in dealing with construction permits: time between Burkina Faso and Mali?
3 days, with Mali ahead.
How many years of comparable data are there for Burkina Faso and Mali?
15 years are reported by both, from 2005 to 2019.
How do Burkina Faso and Mali rank globally for dealing with construction permits: time?
Burkina Faso ranks 111th and Mali ranks 108th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.