Dealing with construction permits: Time in Burkina Faso

Burkina Faso: Dealing with construction permits: Time was 121 days in 2019. ▼ Falling

Latest (2019)
121 days
Change on year
unchanged
World rank
111th
of 185 countries
All-time high
206 days
in 2005
All-time low
121 days
in 2010
Years of data
15
2005–2019

Dealing with construction permits: Time in Burkina Faso, 2005–2019

0501001502002005201220192005: 206 days2006: 206 days2007: 206 days2008: 191 days2009: 131 days2010: 121 days2011: 121 days2012: 121 days2013: 121 days2014: 121 days2015: 121 days2016: 121 days2017: 121 days2018: 121 days2019: 121 days

Source: World Bank. Measured in days.

Analysis

Burkina Faso recorded 121 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 7.6% over ten years.

Over the whole period, dealing with construction permits: time in Burkina Faso peaked at 206 days in 2005 and was at its lowest, 121 days, in 2010.

Burkina Faso ranks 111th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 188 days 131 days 206 days 5
2010s 121 days 121 days 121 days 10

Countries ranked near Burkina Faso

  1. 108 Mali 124 days compare
  2. 109 Vanuatu 123 days compare
  3. 110 Congo, Dem. Rep. 122 days compare
  4. 111 Paraguay 121 days compare
  5. 113 Australia 120.5 days compare
  6. 114 Philippines 120 days compare

See the full ranking of 187 places →

More private sector data for Burkina Faso

All data for Burkina Faso →

Frequently asked questions

What is dealing with construction permits: time in Burkina Faso?
Dealing with construction permits: time in Burkina Faso was 121 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Burkina Faso?
The highest recorded value was 206 days in 2005.
What is the lowest dealing with construction permits: time recorded in Burkina Faso?
The lowest recorded value was 121 days in 2010.
How does Burkina Faso rank for dealing with construction permits: time?
Burkina Faso ranks 111th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Burkina Faso?
Over the last ten years it is down 7.6%. The long-run trend across the full record is falling.
Where does this Burkina Faso data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.