Congo, Dem. Rep. vs Mali: Dealing with construction permits: Time

Congo, Dem. Rep.
122 days
in 2019
Mali
124 days
in 2019
Congo, Dem. Rep. rank
110th
Mali rank
108th

Dealing with construction permits: Time over time

  • Congo, Dem. Rep.
  • Mali
0100200300200520122019

How they compare

Mali currently reports 124 days against 122 days in Congo, Dem. Rep., a difference of 2 days.

The two have swapped places 4 times across 15 shared years of data; in 2005 it was Mali ahead.

Congo, Dem. Rep. ranks 110th and Mali ranks 108th of 185 countries.

Across the 2 decades both report, Congo, Dem. Rep. averaged higher in 1 and Mali in 1.

Head to head by decade

Decade Congo, Dem. Rep. Mali Difference Ahead
2000s 239 days 220.2 days 18.8 days Congo, Dem. Rep.
2010s 126.4 days 140 days 13.6 days Mali

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Congo, Dem. Rep. or Mali?
Mali, at 124 days against 122 days in Congo, Dem. Rep. as of 2019.
What is the difference in dealing with construction permits: time between Congo, Dem. Rep. and Mali?
2 days, with Mali ahead.
How many years of comparable data are there for Congo, Dem. Rep. and Mali?
15 years are reported by both, from 2005 to 2019.
How do Congo, Dem. Rep. and Mali rank globally for dealing with construction permits: time?
Congo, Dem. Rep. ranks 110th and Mali ranks 108th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.