Dealing with construction permits: Time in Congo, Dem. Rep.

Congo, Dem. Rep.: Dealing with construction permits: Time was 122 days in 2019. ▼ Falling

Latest (2019)
122 days
Change on year
unchanged
World rank
110th
of 185 countries
All-time high
239 days
in 2005
All-time low
119 days
in 2010
Years of data
15
2005–2019

Dealing with construction permits: Time in Congo, Dem. Rep., 2005–2019

0501001502002502005201220192005: 239 days2006: 239 days2007: 239 days2008: 239 days2009: 239 days2010: 119 days2011: 119 days2012: 119 days2013: 119 days2014: 150 days2015: 150 days2016: 122 days2017: 122 days2018: 122 days2019: 122 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Congo, Dem. Rep. is 122 days, measured in 2019.

The figure is down 49.0% over ten years.

Over the whole period, dealing with construction permits: time in Congo, Dem. Rep. peaked at 239 days in 2005 and was at its lowest, 119 days, in 2010.

Congo, Dem. Rep. ranks 110th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 239 days 239 days 239 days 5
2010s 126.4 days 119 days 150 days 10

Countries ranked near Congo, Dem. Rep.

  1. 107 Pakistan 124.9 days compare
  2. 108 Mali 124 days compare
  3. 109 Vanuatu 123 days compare
  4. 111 Burkina Faso 121 days compare
  5. 111 Paraguay 121 days compare
  6. 113 Australia 120.5 days compare

See the full ranking of 187 places →

More private sector data for Congo, Dem. Rep.

All data for Congo, Dem. Rep. →

Frequently asked questions

What is dealing with construction permits: time in Congo, Dem. Rep.?
Dealing with construction permits: time in Congo, Dem. Rep. was 122 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Congo, Dem. Rep.?
The highest recorded value was 239 days in 2005.
What is the lowest dealing with construction permits: time recorded in Congo, Dem. Rep.?
The lowest recorded value was 119 days in 2010.
How does Congo, Dem. Rep. rank for dealing with construction permits: time?
Congo, Dem. Rep. ranks 110th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Congo, Dem. Rep.?
Over the last ten years it is down 49.0%. The long-run trend across the full record is falling.
Where does this Congo, Dem. Rep. data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.