Democratic Republic of Congo vs Paraguay: Dealing with construction permits: Time (days) (Time days)

Democratic Republic of Congo
122 days
in 2019
Paraguay
121 days
in 2019
Democratic Republic of Congo rank
113th
Paraguay rank
114th

Dealing with construction permits: Time (days) (Time days) over time

  • Democratic Republic of Congo
  • Paraguay
0100200300200520122019

How they compare

Democratic Republic of Congo currently reports 122 days against 121 days in Paraguay, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Paraguay ahead.

Democratic Republic of Congo ranks 113th and Paraguay ranks 114th of 188 countries.

Across the 2 decades both report, Democratic Republic of Congo averaged higher in 1 and Paraguay in 1.

Head to head by decade

Decade Democratic Republic of Congo Paraguay Difference Ahead
2000s 239 days 275 days 36 days Paraguay
2010s 126.4 days 125.2 days 1.2 days Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Democratic Republic of Congo or Paraguay?
Democratic Republic of Congo, at 122 days against 121 days in Paraguay as of 2019.
What is the difference in dealing with construction permits: time between Democratic Republic of Congo and Paraguay?
1 days, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Democratic Republic of Congo and Paraguay?
15 years are reported by both, from 2005 to 2019.
How do Democratic Republic of Congo and Paraguay rank globally for dealing with construction permits: time?
Democratic Republic of Congo ranks 113th and Paraguay ranks 114th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Democratic Republic of Congo vs Paraguay: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-dem-rep/paraguay/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/congo-dem-rep/paraguay/">Democratic Republic of Congo vs Paraguay: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.