Democratic Republic of Congo vs Paraguay: Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- Democratic Republic of Congo
- Paraguay
How they compare
Democratic Republic of Congo currently reports 122 days against 121 days in Paraguay, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Paraguay ahead.
Democratic Republic of Congo ranks 113th and Paraguay ranks 114th of 188 countries.
Across the 2 decades both report, Democratic Republic of Congo averaged higher in 1 and Paraguay in 1.
Head to head by decade
| Decade | Democratic Republic of Congo | Paraguay | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 239 days | 275 days | 36 days | Paraguay |
| 2010s | 126.4 days | 125.2 days | 1.2 days | Democratic Republic of Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Democratic Republic of Congo or Paraguay?
- Democratic Republic of Congo, at 122 days against 121 days in Paraguay as of 2019.
- What is the difference in dealing with construction permits: time between Democratic Republic of Congo and Paraguay?
- 1 days, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Paraguay?
- 15 years are reported by both, from 2005 to 2019.
- How do Democratic Republic of Congo and Paraguay rank globally for dealing with construction permits: time?
- Democratic Republic of Congo ranks 113th and Paraguay ranks 114th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.